螺杆式啓閉機安裝調試
[來源:來自網絡] [作者:不詳] [日期:22-06-18] [浏覽次數:]

螺杆式啓閉機安裝調試
Installation and commissioning of screw hoist
安裝前,一定要檢查各零件是否良好,潤滑油是否上足,螺栓有無松動,與其有關技術數據是否相符。
Before installation, be sure to check whether the parts are good, whether the lubricating oil is sufficient, whether the bolts are loose, and whether the relevant technical data are consistent.
安裝時,一定要保持基礎布置平面水平180°;啓閉機底座與基礎布置平面的接觸面積要達到90%以上;螺杆軸線要垂直于閘台上橫梁的水平面;要與閘板吊耳孔吻合垂直,避免螺杆傾斜,造成局部受力而損壞機件。
When installing, it is necessary to keep the foundation layout plane horizontal 180 degrees; the contact area between the hoist base and the foundation layout plane should be above 90%; the screw axis should be perpendicular to the horizontal plane of the beam on the gate platform; it should be vertical to the gate lifting earhole to avoid the screw inclination, causing local stress and damage to the machine parts.
安裝後,一定要作試運行,一作無載荷試驗,即讓螺杆作兩個行程,聽其有無異常聲響鋼制閘門 鋼壩 保定輕鋼別墅 保定平面設計培訓 保定室內設計培訓 保定辦公家具  ,檢測安裝是否符合技術要求。二作載荷試驗,在額定載荷下,作兩個行程,觀察螺杆與閘門的運行情況,有無異常現象。確認無誤後,方可正式運行。在載荷運行一段時間後,要進行首次保養,把機內新機件磨擦産生的金屬沫特別是螺杆、螺母、渦輪、渦杆,要輕洗幹淨,塗上潤滑油,密封嚴實,繼續使用。
After installation, it is necessary to make a trial run, a load-free test, that is, let the screw do two strokes, listen to whether there is abnormal sound, check whether the installation meets the technical requirements. Second, the load test, under the rated load, two strokes to observe the operation of the screw and gate, whether there is any abnormal phenomenon. If it is confirmed, it will be officially run. After a period of load operation, the first maintenance should be carried out. The metal foam produced by the friction of the new machine parts, especially screw, nut, turbine, scroll, should be cleaned lightly, coated with lubricant, sealed tightly and used continuously.